Right-sized equipment
Every system starts with a room-by-room Manual J load calc. We pick equipment to match the result, not a rule of thumb.
Designed to head off change orders and mid-build redesign, with an engineer who answers.
Stamped, right-sized HVAC design and Title 24 from one office, so you can show clients the numbers and submit a set built for plan check.
Fixed fee, quoted from your plans. Southern California office, projects statewide.
Most houses get equipment picked by square footage. We calculate the house first, then pick equipment to match. Here's what that's designed to do.
Every system starts with a room-by-room Manual J load calc. We pick equipment to match the result, not a rule of thumb.
Equipment that fits the load is designed to run longer, steadier cycles. Room-by-room loads and duct design are how we design for even temperatures.
A system sized to the load is designed to use less energy than one that's oversized. We don't promise a number on your bill. That depends on the house, the weather, and how you live in it.
Heat pump systems designed to the California Energy Code in effect for your permit application, with the compliance numbers in the Title 24 report, so the energy report matches the equipment.
Each is a fixed fee, quoted from your plans. Send them and we come back with a number, not an hourly estimate.
A room-by-room Manual J load calculation for each system, with the report for your permit set. A good fit when a designer or contractor is handling the rest.
Manual J load calc, Manual S equipment selection, Manual D duct design or room airflows for your contractor's layout, ventilation and exhaust, and equipment schedules, stamped by a licensed California mechanical engineer. Exact scope is in your proposal. Space and clearances shown early for the architect and framers. Add the indoor air quality level: balanced ventilation, MERV 13 to 16 filtration, and air sensing with a smoke mode.
Energy compliance for new homes and additions, with the CBECC-Res model and the CF1R for your permit set. Modeled to the California Energy Code in effect for your permit application.
One office handles the HVAC design and the Title 24 report, so both use the same loads and the same equipment. One point of contact, fewer mismatches between the sheets and the report.
Light commercial? Ask. We'll tell you straight whether it's a fit.
Send the plans and a few basics. We come back with questions only when we need them.
We run the load calc, pick equipment to match, and design the ducts, ventilation, and Title 24 model.
A stamped set and a signed Title 24 report. Plan check questions go straight to the engineer.
Before the load calc was finished on a recent two-building project, the architect had a space and clearance reservation for every outdoor unit, fan coil, and equipment closet.
An architect we had already worked with asked us to add Title 24 to a project already in design, so the energy report would use the same loads and equipment as the HVAC design.
The engineer who runs the load calc and picks the equipment is the one who answers your email. Every package is reviewed by a licensed California mechanical engineer who practices in HVAC.
Strome started with a house: the goal was a home that was comfortable to live in, and the discovery that the HVAC on many residential plans is sized by rule of thumb and drawn by nobody.
A custom home is engineered everywhere else. We give the mechanical system the same care: calculate the house first, choose equipment to match, show the numbers, and have every package reviewed by a licensed California mechanical engineer who practices in HVAC. The story
A PDF of the architectural set is enough to start. We reply by email with questions, if any, and a fixed fee.